Tile Flooring Cost Per Square Metre
These are the tile figures published in our Australian flooring cost guide:
| Tile flooring | Supply Only (per m²) | Installed Cost (per m²) |
|---|---|---|
| Tiles | $40 – $120 | $90 – $200 |
If the tiles are already bought and you only need them laid, the installation-only figure is the one to read:
| Tile flooring | Installation Only (per m²) |
|---|---|
| Tiles | $50 – $100 |
The gap between the low and high end is wide on purpose. The rest of this page explains what moves a job from one end of that range to the other. For a figure for your own floor, ask us for a measured quote.
What Moves Tile Flooring Cost Up or Down
The condition of the floor underneath
This is the single biggest surprise on most tile quotes. Tiles are rigid, so they need a flat, sound base — any dip or hump shows up as a lipped edge or, worse, a cracked tile later. If the existing floor needs grinding or a levelling compound before tiling, that is extra work before a single tile is laid.
Tile size and the type of tile
Large-format tiles look seamless but are heavier and less forgiving — they need a flatter base and more care per tile. Very small tiles and mosaics take longer simply because there are more of them. Porcelain is harder to cut than ceramic, which shows up as labour time.
The laying pattern
A straight grid is the quickest. Anything on a 45-degree angle, a herringbone, or a pattern that has to line up with a feature wastes more tile in cuts and takes longer to set out.
Cuts, corners and the shape of the room
A plain rectangle tiles fast. Doorways, kitchen islands, cabinets, pipes and curved walls all mean hand-cutting around obstacles. Two rooms of identical area can differ a lot for this reason alone.
Removing the old floor
Lifting an existing floor and taking the waste away is its own job. Old tiles bedded in mortar are the slowest to remove, and the rubbish is heavy.
Waterproofing in wet areas
Bathrooms, laundries and shower bases need waterproofing before tiling. It is required work in a wet area, not an upgrade.
Room size
The per-square-metre rate usually eases on a larger floor, because setting out and site preparation are spread over more area. Small rooms can look expensive per square metre for exactly that reason.
Reading a Tile Flooring Quote
When you compare two tile quotes, check they include the same work. The common differences are:
- Is the tile supplied or is it installation only? The two figures above are different jobs.
- Is floor preparation included, or added once the old floor is lifted and the base is seen?
- Is removal and rubbish removal in the price?
- Are adhesive, grout, trims and edge strips listed, or extra?
- Is waterproofing included for a wet area?
- Is there an allowance for cuts and breakage? Patterned layouts need more tile than the floor area.
A quote that looks cheaper often simply covers less. Asking for the same inclusions on both is the quickest way to compare fairly.
Tile Flooring Cost — Common Questions
Why do two tile quotes for the same room differ so much?
Usually because of the floor underneath and what each quote includes. One may allow for levelling and removing the old floor while the other prices laying tiles onto a floor assumed to be ready.
Is it cheaper to tile a large room or a small one?
Per square metre, larger floors are usually more efficient — set-out and preparation are spread over more area. A small bathroom can cost more per square metre than a big living area.
Does the laying pattern really change the price?
Yes. A herringbone or diagonal layout takes longer to set out and wastes more tile in cuts than a straight grid.
Do I need to level the floor before tiling?
If it is out of level or uneven, yes — tiles are rigid and an uneven base leads to lipped edges and cracking. We check the floor before quoting rather than assuming. See our guide to floor levelling.
Can I tile over an existing tiled floor?
Sometimes, if the existing tiles are sound, well bonded and the extra height works with your doors and any adjoining floors. It needs checking on site — it is not a given.
How do I get a figure for my own floor?
Measure the room and send us the details. We look at the floor, the tile and the layout before giving a figure.
Get a Measured Tile Flooring Quote in Melbourne
Arta Floor is based in Northcote and works across Melbourne. If you tell us the room, the tile you have in mind and the condition of the existing floor, we can give you a figure that reflects the actual job rather than a guess.
Contact Arta Floor to arrange a measure and quote.