Concrete Floor Levelling
A concrete slab is rarely as flat as it looks. Slabs are poured to a tolerance, they settle, and years of patching, adhesive and old floor coverings leave humps and dips behind. Before a new floor goes down, that slab has to be brought within tolerance — and concrete behaves differently from a timber subfloor, so it needs a different approach.
This page covers concrete specifically: how a slab is assessed, what is done to it, why moisture matters on a slab and what makes one slab a bigger job than another.
How a Concrete Slab Is Assessed Before Levelling
Nothing sensible can be decided until the slab has been measured. On a concrete floor we look at:
- How far out of level it is, and where. A slab can be close to level overall but still have a sharp dip in one bay. What matters is the deviation over a short distance, not the fall across the whole room.
- Whether the surface is sound. Concrete that is dusty, crumbling or flaking on top will not hold a bond, so the weak layer has to come off first.
- What is stuck to it. Old adhesive, paint, curing compound, tile beds and render all stop a levelling compound bonding to the slab.
- Moisture in the slab. This is the one that is unique to concrete and the one most often skipped — see below.
- Cracks and joints. A hairline shrinkage crack is treated differently from a moving joint or a structural crack, which must not simply be filled over.
Why Moisture Matters on Concrete and Not on Timber
A concrete slab holds water. A new slab is still drying for months, and an older slab sitting on ground without an effective vapour barrier can stay damp indefinitely. That moisture has to go somewhere, and once a floor is laid on top, it moves up into whatever is above it.
This is why a concrete job includes a moisture check before anything is bonded down. If the slab reads too high, the answer is either to wait or to apply a moisture barrier — not to carry on and hope. Skipping it is a common cause of a floor lifting, cupping or smelling months after it was laid, and by then the fix means taking the new floor back up.
A timber subfloor does not behave this way. It moves with humidity instead, which is why the two need different preparation rather than the same method applied twice.
Preparing the Slab: Grinding, Patching and Priming
Bringing a slab to a bondable, level surface is usually three separate pieces of work:
Mechanical preparation
High spots are ground down and contamination is taken off, so the compound bonds to sound concrete rather than to whatever was on top of it. This is a dust-generating job and is done with extraction on site.
Patching and crack treatment
Deep holes, gouges and redundant penetrations are filled first, so the levelling layer is not asked to bridge a void. Cracks are treated according to what they are — a moving joint is carried through the new layer, not buried under it.
Priming
Bare concrete is porous and drinks the water out of a compound too quickly, which weakens it and leaves pinholes. The correct primer for the slab’s porosity controls that, and it is not an optional step.
Self-Levelling Compound on a Concrete Slab
Once the slab is clean, sound and primed, a cement-based self-levelling compound is used to bring the surface within tolerance. On concrete, cement-based compounds are the usual choice because the slab itself does not flex.
Two points specific to slabs are worth knowing:
- Depth has limits. Each compound has a minimum and maximum thickness. A deep dip is built up in layers or filled first, rather than poured in one go beyond what the product allows.
- It must be allowed to cure, not just to feel dry. A surface can be walkable long before it is ready for a floor to be bonded to it, and the waiting time depends on depth and conditions on site.
What Makes One Concrete Floor a Bigger Job Than Another
Two slabs of the same size can be very different pieces of work. What drives it:
- How much of the slab is out, and by how much — that sets how much compound is needed.
- What has to be removed first — old tile beds and stubborn adhesive are slow.
- The moisture reading — a slab needing a barrier is an extra stage.
- Access — bagged material and a grinder into an upper-level apartment is not the same as a ground-floor job with a driveway.
- Whether the room can be closed off — grinding needs the area free.
For general levelling background that is not specific to slabs, see our guide to floor levelling.
Concrete Floor Levelling — Common Questions
How flat does a concrete slab need to be?
It depends on the floor going over it — the flooring manufacturer sets the tolerance, and it is measured as deviation over a set distance rather than level across the whole room.
Can self-levelling compound go straight onto bare concrete?
Not without preparation. The slab needs to be clean and sound, and it needs the right primer, or the compound loses water into the slab and does not bond properly.
Why does my new slab need to wait?
A new slab is still releasing moisture. Bonding a floor to it too early traps that moisture under the new floor, which is how floors lift and cup later.
Is a crack in my slab a problem?
It depends what it is. A fine shrinkage crack can be filled; a joint that is still moving, or a crack that suggests a structural issue, must be assessed rather than covered over.
Can the high spots just be ground down instead?
Sometimes, if the slab is only a little out in a few places. Where there are dips as well as humps, grinding alone cannot fill a hollow, so it is usually grinding plus a levelling layer.
How do I find out what my slab needs?
It has to be looked at and measured. Ask us to assess the slab and we will tell you what it actually needs.
Concrete Floor Levelling in Melbourne
Arta Floor is based in Northcote and works across Melbourne on concrete slabs in houses, apartments and commercial spaces. We check the slab — level, soundness, contamination and moisture — before recommending a method, so the preparation suits the floor that is going on top of it.
Contact Arta Floor to arrange an assessment.